Distribution Transformer

25 kVA Distribution Transformer (11kV)

Reliable 25 kVA distribution transformer stepping down 11kV to 415V for small industrial and commercial installations. Features efficient core design and robust construction for outdoor/indoor deployment.

Rating25 kVA
Voltage11kV / 415V
Coolingboth air and oil cooled
Lead Time4–5 weeks

Ref. DIST-25-11KV · Lead time 4–5 weeks · Made to order from Hapur

See full engineering specification & variants
25 kVA Distribution Transformer (11kV)

Key Features

Step-down from 11kV to 415V
Efficient silicon steel core
Pure copper wound coils for better cooling
Copper bus bars for low losses
Suitable for outdoor/indoor installation
Oil-cooled design
Standard cooling fins for air circulation
Thermal overload protection

Recommended For

Small Industrial Parks
Commercial Complexes
Residential Colonies
School/College Campuses
Hospital Power Distribution
Retail Shopping Centers

Specifications

SpecificationValue
Capacity25 kVA
Primary Voltage11000V (±5%)
Secondary Voltage415V (±5%)
Frequency50 Hz
Cooling Methodboth air and oil cooled
Copper Loss~500W
Iron Loss~250W
Weight800 kg

Reading the specification

What these numbers mean for your installation

A datasheet tells you what the unit does. This is what each figure changes about how you specify, feed and site it — worked out for the 25 kVA specifically, not the range in general.

Standing (no-load) cost

2,190 kWh/year

Iron loss of 250 W is drawn whenever the transformer is energised, whether or not anything is connected. Over a year that is 2,190 kWh — about ₹17,520 at ₹8/kWh. It is the figure worth comparing between quotes, because you pay it for the full 25-year life regardless of load.

Full-load efficiency

96.8%

At full load and 0.9 power factor, total losses of 750 W give roughly 96.8% efficiency. Copper loss varies with the square of load, so a transformer run at half capacity dissipates about a quarter of that 500 W — oversizing costs you standing loss, not copper loss.

Primary voltage class

11000V

An 11 kV primary at this rating is the smallest HT connection that makes commercial sense. Below it the switchgear, metering and operator requirement usually outweigh the tariff benefit, and an LT connection from the DISCOM is the cheaper answer.

Running-cost figures assume a reference industrial tariff of ₹8/kWh and continuous energisation. Substitute your own tariff and duty hours for a site-specific number — we will run it with you on request.

Sizing Guide

When is 25 kVA the right choice?

25 kVA is the smallest practical HT connection. It suits a site that needs its own transformer for supply reliability or tariff reasons rather than for load — a small industrial plot, a residential colony's common services, a pump house or telecom installation, a campus block. Below this rating an LT connection from the DISCOM is almost always cheaper once you count 11 kV switchgear, HT metering and the licensed operator the connection requires. Above roughly 20 kVA of steady load, look at the 63 kVA unit instead: a distribution transformer run continuously near its nameplate has no margin for the load growth every site eventually has, and no headroom for motor starting.

Before you order

Where 25 kVA goes in, and what the site needs

Typical installations

We supply 25 kVA most often into small industrial parks, commercial complexes, residential colonies and school/college campuses, alongside hospital power distribution and retail shopping centers. What separates those sites is load factor. A transformer serving a steady process load and one serving a facility with a sharp evening peak have very different loss profiles over a year, even at an identical nameplate rating.

Site preparation

At 800 kg this is forklift work, and the forklift has to be rated for 800 kg at the extended reach that placement requires. Confirm floor loading before it arrives — a ground-floor workshop slab is normally adequate, a mezzanine generally is not. Leave working clearance on the terminal side for cable entry and inspection. Sustained ambient above 45 °C, or an enclosed room without cross-ventilation, requires derating — send us the room conditions and we will confirm the rating still holds where you intend to put it.

Statutory requirements

A 11 kV primary connection falls under CEA safety regulations: approved HT switchgear, earthing and statutory clearances, drawings submitted to the electrical inspector, and a certified operator for switching. Build that approval time into your programme — it routinely exceeds our 4–5 weeks manufacturing lead time, and it is the step that delays energisation far more often than the transformer does.

Adjacent ratings

If 25 kVA is not the right size

Sizing rarely lands exactly on a catalogue rating first time. These are the ratings either side of it in the same range — compare the specification before you commit.

Engineering detail on this configuration

The distribution transformer pages carry the full design rationale, comparison tables and application notes behind this SKU.

Ready to specify?

Share your load profile. Get a firm proposal in 24 hours.

Send us your kVA requirement, supply voltage range, and site conditions. Our engineer will confirm whether this configuration is correct for your installation, or specify an alternative if needed. No distributors — direct from our factory in Hapur.

Submit load requirements